Department of Corrections
WCC: Paint & Repair 300,000 Gallon Water Storage Tank
30000697
Construction funding is provided for lead paint abatement and rust repair for the Washington Corrections Center's 300,000 gallon water tank.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
0 | 100,000 | 400,000 | 3,006,000 | 0 | 3,506,000 |
Funds: State Building Construction Account - State | 3,506,000 |
LCC: Replace Fire Alarm System
30000772
Funding is provided to replace the obsolete and failing smoke alarm system by upgrading to a system that is code compliant and will protect individuals at the Larch Corrections Center.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
0 | 0 | 0 | 2,456,000 | 0 | 2,456,000 |
Funds: State Building Construction Account - State | 2,456,000 |
SW IMU Recreation Yard Improvement
30001123
Funds the design and construction of larger, more open secure yards at Intensive Management Units throughout the state. The Washington Corrections Center is a priority for 2023-25 funding. Funding is reappropriated to continue remodel of recreation yards from the 2021-23 biennium.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
625,000 | 111,000 | 2,264,000 | 2,000,000 | 2,000,000 | 7,000,000 |
Funds: State Building Construction Account - State | 7,000,000 |
SCCC Roof Replacement
30001128
Design and construction funding is provided to replace 62,500 square feet of the original roofing and failing roof top equipment, including fans or vents.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
0 | 0 | 0 | 6,194,000 | 0 | 6,194,000 |
Funds: State Building Construction Account - State | 6,194,000 |
ECWR: Foundation and Siding
40000067
Funding is provided to repair wood-framed walls and floors on the northeast side of the building and replace the building envelope, which includes siding and windows, at the Eleanor Chase Work Release facility in Spokane.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
0 | 100,000 | 750,000 | 5,111,000 | 0 | 5,961,000 |
Funds: State Building Construction Account - State | 5,961,000 |
MCC: SOU and TRU - Domestic Water and HVAC Piping System
40000246
Funding is provided for construction to replace the domestic and HVAC water piping and repair wiring and ductwork for HVAC systems at Twin Rivers and Special Offenders Units. A reappropriation of funds is also granted to complete the design.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
106,000 | 420,000 | 2,603,000 | 26,000,000 | 21,143,000 | 50,272,000 |
Funds: State Building Construction Account - State | 50,272,000 |
CBCC: Fire Pump Replacement
40000324
Construction funding is provided to replace the fire suppression water booster pumps and motors required to move large volumes of water when a fire occurs.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
0 | 0 | 0 | 1,411,000 | 0 | 1,411,000 |
Funds: State Building Construction Account - State | 1,411,000 |
Inpatient Psychiatric Unit
40000413
Funding is provided for a predesign to evaluate the best location, alternatives and other analysis needed to design and build an inpatient psychiatric unit to serve the incarcerated population.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
0 | 100,000 | 250,000 | 2,550,000 | 17,100,000 | 20,000,000 |
Funds: State Building Construction Account - State | 20,000,000 |
CRCC Sage Unit Move to AHCC
40000414
Remaining funding is provided to renovate Airway Heights Corrections Center units to accommodate the special needs, aging and infirm male population that is currently housed at the Coyote Ridge Corrections Center Sage Unit.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
0 | 150,000 | 900,000 | 1,452,000 | 0 | 2,502,000 |
Funds: State Building Construction Account - State | 2,502,000 |
AHCC: Modular Building for Health Service Staff
40000415
Funding is provided for modular buildings to provide additional space for staffing and medical services at Airway Heights Corrections Center.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
0 | 100,000 | 691,000 | 408,000 | 0 | 1,199,000 |
Funds: State Building Construction Account - State | 1,199,000 |
CRCC: Modular Building for Health Service Staff
40000416
Funding is provided for modular buildings to provide additional space for staffing and medical services at Coyote Ridge Corrections Center.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
0 | 100,000 | 677,000 | 428,000 | 0 | 1,205,000 |
Funds: State Building Construction Account - State | 1,205,000 |
McNeil Island Passenger Ferry Replacement
40000418
Funds the design and marine transportation study to evaluate the best alternatives for vessel types and infrastructure required to support a new hybrid passenger ferry.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
0 | 0 | 0 | 900,000 | 11,158,000 | 12,058,000 |
Funds: State Building Construction Account - State | 12,058,000 |
McNeil Island Transport Barge Replacement
40000419
Funding is provided for the design of two new replacement transport barges. The process for ordering and constructing a barge is complicated and lengthy, requiring careful planning and building in extensive lead time for vessel delivery.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
0 | 0 | 0 | 900,000 | 7,385,000 | 8,285,000 |
Funds: State Building Construction Account - State | 8,285,000 |
Minor Works Preservation Projects
40000427
Minor works preservation funding is provided to reduce risks to people and property and maximize the function and utility of state assets.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
0 | 0 | 0 | 11,417,000 | 61,689,000 | 73,106,000 |
Funds: State Building Construction Account - State | 73,106,000 |
WSP: Unit Six Roof Replacement
92000037
Funding is provided to construct a new roof and roof-top heating ventilation and air conditioning equipment on Unit 6 at the Washington State Penitentiary. A reappropriation is also granted to complete design of the project.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
639,000 | 412,000 | 374,000 | 12,569,000 | 0 | 13,994,000 |
Funds: State Building Construction Account - State | 13,994,000 |