Washington State Patrol
Vancouver Crime Lab - New Roof
30000240
Funding is provided to replace the membrane roofing material with new PVC membrane laid over tapered insulation board to ensure water flow and provide additional thermal efficiency. The new roof will be replaced with energy efficient materials that will deter the elements.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
0 | 0 | 0 | 1,594,000 | 0 | 1,594,000 |
Funds: State Building Construction Account - State | 1,594,000 |
Crime Laboratory I-5 Corridor Consolidated Facility
30000290
Funds land acquisition and design construction documents for a new crime lab north of Seattle.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
0 | 283,000 | 50,000 | 15,100,000 | 150,000,000 | 165,433,000 |
Funds: State Building Construction Account - State | 165,433,000 |
FTA Minor Works and Repairs
40000031
Expenditure authority is provided to enable the agency to train Fire Fighter 1 program trainees more effectively with additional training resources.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
0 | 25,000 | 200,000 | 237,000 | 670,000 | 1,132,000 |
Funds: State Building Construction Account - State | 1,132,000 |
Fire Training Academy Roof Replacement
40000077
Funds replacement of the administration building and classrooms roofs with energy-efficient materials and increased insulation to meet current code requirements and improve energy efficiency.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
0 | 0 | 0 | 572,000 | 0 | 572,000 |
Funds: State Building Construction Account - State | 572,000 |
Seattle Crime Laboratory Generator Replacement
40000081
The existing generator will be replaced with a new, more energy-efficient unit that meets the demands, requirements and operational needs of the facility.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
0 | 0 | 0 | 450,000 | 0 | 450,000 |
Funds: State Building Construction Account - State | 450,000 |