Military Department

King County Area Readiness Center

30000592

The department has contracted with a developer for design of water and sewer systems, and the purchase of a suitable property in North Bend to vacate the Seattle Armory.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
25,000 6,461,000 569,000 12,000,000 0 19,055,000
Funds: State Building Construction Account - State 19,055,000

Tri-Cities Readiness Center

30000808

Additional state funding is provided for federal match to construct the Richland Readiness Center and replace the Pasco Readiness Center.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
6,573,000 8,347,000 1,980,000 2,944,000 0 19,844,000
Funds: General Fund - Federal 13,900,000
Funds: State Building Construction Account - State 5,944,000

Snohomish Readiness Center

30000930

Funding is provided to renovate the kitchen, restrooms, showers, administration offices, platoon rooms and storage areas in the Snohomish Readiness Center.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
0 492,000 5,423,000 3,903,000 0 9,818,000
Funds: General Fund - Federal 6,545,000
Funds: State Building Construction Account - State 3,273,000

Field Maintenance Shop Addition-Sedro Woolley FMS

40000104

Expenditure authority is provided to upgrade and expand the Field Maintenance Shop in Sedro Woolley.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
0 1,000 1,375,000 874,000 0 2,250,000
Funds: General Fund - Federal 2,250,000

Camp Murray Bldg 47 and 48 Barracks Replacement

40000190

Expenditure authority is provided to demolish existing Building 47 and 48 barracks, and design and construct upgraded replacement barracks at Camp Murray.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
0 163,000 1,984,000 853,000 0 3,000,000
Funds: General Fund - Federal 3,000,000

Camp Murray Bldg 65 Barracks Replacement

40000191

Expenditure authority is provided to demolish existing Building 65 barracks, and design and construct upgraded replacement barracks at Camp Murray.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
0 168,000 2,068,000 764,000 0 3,000,000
Funds: General Fund - Federal 3,000,000

Camp Murray Bldg 34 Renovation

40000192

Funding is provided to renovate the floor plan to improve functionality and optimize available space. The renovation includes replacing old infrastructure systems with new medical-grade plumbing, communication systems, electrical service, a secure controlled storage area for medical records to meet HIPAA requirements, and secure climate-controlled storage space for Class VIII items (medical supplies and vaccines). The renovation also includes transitioning existing office space into a laboratory for blood testing and other services that will provide severely needed functionality.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
0 0 0 8,340,000 0 8,340,000
Funds: General Fund - Federal 4,915,000
Funds: State Building Construction Account - State 3,425,000

Moses Lake Readiness Center Renovation

40000194

This project will ensure long-term support for training and operational needs of the Washington National Guard, continue serving the community as a regional anchor for recruiting efforts and serve as a multi-agency emergency operations center during disasters or other activations.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
0 0 0 5,542,000 0 5,542,000
Funds: General Fund - Federal 3,080,000
Funds: State Building Construction Account - State 2,462,000

JBLM Non-Organizational (POV) Parking Expansion

40000196

This request reappropriates funds and increases federal spending authority to construct a 2,725 square yards parking lot for non-departmental vehicles. This lot will add about 60 parking spots to support the assigned units and guests that visit the location. It also adds sidewalks and exterior lighting to improve pedestrian safety and access to the building.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
0 0 1,245,000 650,000 0 1,895,000
Funds: General Fund - Federal 1,895,000

Minor Works Program 2023-25 Biennium

40000274

Funding is provided for minor works program projects at several of the 450 state-owned or federally licensed facilities throughout the state. These projects will help to address issues with the department's aging facilities, which need significant investments to remain operational.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
0 0 0 12,485,000 0 12,485,000
Funds: General Fund - Federal 7,764,000
Funds: State Building Construction Account - State 4,721,000

WA Army National Guard Vehicle Storage Buildings

40000290

This project creates additional vehicle storage buildings and addresses shortfalls in four additional key locations across the state: Camp Murray, Joint Base Lewis McChord, Yakima Training Center and the newly completed Tri-Cities Readiness Center.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
0 0 0 12,200,000 1,960,000 14,160,000
Funds: General Fund - Federal 13,410,000
Funds: State Building Construction Account - State 750,000

Yakima Training Center 951 Renovation

40000297

This project will design and renovate the functional areas of the Yakima Trainging Center 951 General Instruction Building for an educational facility. Specific work includes removal and modification; repainting; new ceiling, floor and door installation; HVAC and electrical work; and communication line modification.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
0 0 0 3,060,000 0 3,060,000
Funds: General Fund - Federal 3,060,000

Central Building Automation System for National Guard Buildings

40000298

The project will meet federally directed requirements relating to cybersecurity of facility-related control systems and associated building management system, and is 100% federally reimbursed.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
0 0 0 2,227,000 0 2,227,000
Funds: General Fund - Federal 2,227,000

Spokane Readiness Center IT Infrastructure Upgrade

40000300

Funding is provided for design and construction to bring the Spokane Readiness Center data center and Telecommunications Bonding Network infrastructure into compliance.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
0 0 0 1,850,000 0 1,850,000
Funds: General Fund - Federal 1,241,000
Funds: State Building Construction Account - State 609,000

Minor Works Preservation 2023-25 Biennium

40000301

These projects provide capital asset preservation creating and/or sustaining safe, comfortable and efficient buildings for agency employees and community members across the state. Projects include: replacement of HVAC systems and components to reduce energy costs and extend the life of critical systems; installation of new lighting, flooring and finishes to reduce safety hazards; demolition of structures beyond repair, improving stormwater drainage; and road and/or parking lot repairs and resurfacing.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
0 0 0 7,450,000 0 7,450,000
Funds: General Fund - Federal 3,971,000
Funds: State Building Construction Account - State 3,479,000

Kent Readiness Center Water Damage Repairs

40000311

Funds French drain installation and repairs to walls damaged by water infiltration through cleaning, repainting, and sealing of the masonry cinder block on exterior and interior façades, and replacement of damaged flooring.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
0 0 0 2,276,000 0 2,276,000
Funds: General Fund - Federal 1,707,000
Funds: State Building Construction Account - State 569,000

Yakima Training Center Army NG Combat Fitness Training Facility

40000314

This project will provide the Washington Army National Guard and soldiers in its formation with a multiple-purpose athletic field and physical fitness facility with the storage capacity to accommodate training and testing for the new Army Combat Fitness Test.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
0 0 0 600,000 6,000,000 6,600,000
Funds: General Fund - Federal 6,600,000