Capital Two-Year Agency Detail - Department of Corrections
WCC: Paint & Repair 300,000 Gallon Water Storage Tank
30000697
Design funding is provided for lead paint abatement, scaffolding and confinement tent, and rust repair for the 300,000-gallon water tank. This water tank is responsible for providing fresh water and fire suppression to a third of the facility.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
500,000 | 500,000 |
State Building Construction Account - State | 500,000 |
ECWR: Foundation and Siding Repair
40000067
Funding is provided to repair wood framed walls and floors on the northeast side of the building, and replace the building envelope which includes siding and windows. This will address structural concerns with the foundation, stairs and sidewalks, increasing safety for staff and residents.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
850,000 | 850,000 |
State Building Construction Account - State | 850,000 |
MCC: Sewer System HABU (Highest and Best Use)
40000185
This project's reappropriation was increased to reflect additional unspent appropriations in the 2019-21 fiscal biennium.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
(220,000) | 220,000 |
State Building Construction Account - State |
LCC: Boiler Replacement
40000255
Funding is provided to complete the central boiler replacement at Larch Corrections Center.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
3,695,000 | (3,695,000) |
State Building Construction Account - State |
WCC: Interim Mental Health Building
40000260
Funding is provided for the design and construction of modular buildings, creating office space and confidential mental health screening booths for incarcerated individuals at Washington Corrections Center.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
1,275,000 | 1,275,000 |
State Building Construction Account - State | 1,275,000 |
MCC: TRU Support Building HVAC Replacement
40000379
The funding source is changed due to eligibility requirements provided by the U.S. Treasury for the federal American Rescue Plan Act.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
Coronavirus Capital Projects Account - Federal | (4,646,000) |
Coronavirus State Fiscal Recovery Fund - Federal | 4,646,000 |
Inpatient Psychiatric Unit
40000413
Funds a predesign to evaluate the best location, alternatives and other analysis needed to design and build an inpatient psychiatric unit to serve the incarcerated population.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
350,000 | 350,000 |
State Building Construction Account - State | 350,000 |
CRCC Sage Unit Move to AHCC
40000414
Funding is provided to renovate Airway Heights Corrections Center units to accommodate the special needs, aging and infirm male population that is currently housed at Coyote Ridge Corrections Center Sage Unit. This will provide improved access to community hospital care for the most vulnerable incarcerated population.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
2,105,000 | 2,105,000 |
State Building Construction Account - State | 2,105,000 |
AHCC: Modular Building for Health Service Staff
40000415
Funds additional space at AHCC to provide basic medical services to incarcerated individuals. Adding modular buildings will provide needed space for staffing and medical services.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
791,000 | 791,000 |
State Building Construction Account - State | 791,000 |
CRCC: Modular Building for Health Service Staff
40000416
Funds additional space at CRCC to provide basic medical services to incarcerated individuals. Adding modular buildings will provide needed space for staffing and medical services.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
777,000 | 777,000 |
State Building Construction Account - State | 777,000 |
McNeil Island Passenger Ferry Replacement
40000418
McNeil Island is the location of two operational facilities, the Special Commitment Center and the Pierce County Secure Community Transition Facility. Both are operated by the Department of Social and Health Services, while the Department of Corrections is responsible for stewardship of the island. Funding is provided for a comprehensive marine transportaion study for a new hybrid passenger ferry. Reliable clean energy marine transportation is needed for DOC and DSHS.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
611,000 | 611,000 |
State Building Construction Account - State | 611,000 |
McNeil Island Transport Barge Replacement
40000419
Funds the design phase of construction for two new replacement transport barges. The barges support McNeil Island operations by providing food, fuel, construction materials, contractor equipment and other state agency functions. Commissioning the construction of the new barges can take up to 2.5 years and is dependent upon shipyard and material availability.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
250,000 | 250,000 |
State Building Construction Account - State | 250,000 |
State Agency Compliance with Clean Buildings Law
40000420
Funding is provided for sub-metering and energy audits to comply with the Clean Buildings Law.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
770,000 | 770,000 |
State Building Construction Account - State | 770,000 |
WSP: Unit Six Roof Replacement
92000037
This project's reappropriation was increased to reflect additional unspent appropriations in the 2019-21 fiscal biennium.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
(136,000) | 136,000 |
State Building Construction Account - State |
WCCW: AC for MSU
92000039
Additional funding is added to cover unforeseen material cost increases due to COVID-19.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
53,000 | 160,000 | 213,000 |
State Building Construction Account - State | 213,000 |