Capital Two-Year Agency Detail - Department of Social and Health Services

Western State Hospital New Kitchen and Commissary Building

20081319

This project's reappropriation was increased to reflect additional unspent appropriations in the 2019-21 fiscal biennium.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
(83,000) 83,000
State Building Construction Account - State

Fircrest School-Nursing Facilities: Replacement

30002755

This project's reappropriation was increased to reflect additional unspent appropriations in the 2019-21 fiscal biennium.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
(58,000) 58,000
State Building Construction Account - State

Eastern State Hospital-Westlake: New HVAC DDC Controls

30002759

The funding source is changed due to eligibility requirements provided by the U.S. Treasury for the federal American Rescue Plan Act.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
State Building Construction Account - State 1,450,000
Coronavirus Capital Projects Account - Federal (1,450,000)

DOC/DSHS McNeil Island-Infrastructure: Repairs & Upgrades

30003211

The boat lift enables staff to load passengers in a stable environment and then lower the boat to the water for transportation to the mainland however, the existing boat lift is no longer operational. Funding will enable the replacement of the inoperable outboard speed boat lift at the Main Dock as well as storing the boat out of the corrosive salt water which will extend its service life and improve reliability for emergency responses. In addition, funding is provided to upgrade power poles, mechanical connectors, and overhead high voltage lines. This improves the reliability of the electrical distribution system which will improve SCC operations and decrease the costs associated with emergency repairs to the electrical distribution system.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
1,315,000 1,315,000
State Building Construction Account - State 1,315,000

Special Commitment Center-Campus: HVAC Units Replacement

30003586

Design and construction funding is provided to replace the existing swamp coolers at SCC with energy-efficient HVAC units to properly cool medium- and high-security housing units.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
2,050,000 2,050,000
State Building Construction Account - State 2,050,000

Minor Works Program Projects: Statewide 2021-23

40000569

Funding is provided for minor works capital projects to construct a new commissary as an addition to the maintenance building for the receipt, storage, and distribution of consumable items.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
425,000 425,000
State Building Construction Account - State 425,000

Minor Works Preservation Projects: Statewide 2021-23

40000571

Funding is provided for minor works capital projects to preserve and extend the life of existing agency facilities and supporting infrastructure systems.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
2,795,000 2,795,000
State Building Construction Account - State 2,795,000

Transitional Care Center-Main Building: Patient Rooms Cooling

40000574

The funding source is changed due to eligibility requirements provided by the U.S. Treasury for the federal American Rescue Plan Act.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
Coronavirus Capital Projects Account - Federal (2,335,000)
Coronavirus State Fiscal Recovery Fund - Federal 2,335,000

Fircrest School-ICF Cottages: HVAC & Water Heater Improvements

40000946

Upgrading the HVAC at Fircrest School will not only reduce greenhouse gas emissions and demand on the current central boiler, but will better support residents as they develop skills and independence to thrive in the community.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
5,780,000 5,780,000
State Building Construction Account - State 5,780,000

Western State Hospital-Building 29: CMS Certification

40000948

The department will conduct a survey at Western State Hospital to identify areas that are currently out of CMS compliance and the work necessary to regain CMS certification.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
440,000 440,000
State Building Construction Account - State 440,000

State Agency Compliance with Clean Buildings Law

40000951

Funding is provided for sub-metering and energy audits to comply with the Clean Buildings Law.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
693,000 693,000
State Building Construction Account - State 693,000