Soos Creek Hatchery Renovation

30000661

Funding is provided for the last phase of the Soos Creek Hatchery renovation project, including habitat restoration and site work, cultural resources mitigation and installation of a water filtration system.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
2,936,000 (3,031,000) (95,000)
State Building Construction Account - State (95,000)

Beaver Creek Hatchery - Renovation

30000680

This project is to predesign the renovation of the Beaver Creek Hatchery to create and maintain recreational fishery opportunities in southwest Washington. Design and permitting activities will occur during the 2021-23 biennium, with construction scheduled for the following biennium.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
150,000 11,355,000 11,505,000
State Building Construction Account - State 11,505,000

Eells Springs Production Shift

30000723

Funding is reappropriated from the 2015-17 biennium to continue the modification and expansion of the Eells Springs hatchery intake and water supply line to maintain lowland trout production in western Washington. This project’s reappropriation was increased to reflect appropriations left unspent in the 2017-19 biennium.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
(146,000) 146,000
State Building Construction Account - State

Forks Creek Hatchery - Renovate Intake and Diversion

30000827

A missed reappropriation from the 2017-19 biennium for an approved fund transfer is provided. The transfer was from the Hoodsport Hatchery Adult Pond Renovation project (40000026) to the Forks Creek Hatchery - Renovate Intake and Diversion project (30000827).

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
196,000 154,000 350,000
State Building Construction Account - State 350,000

Wiley Slough Dike Raising

40000004

Funds are provided to address the deficiencies of the Wiley Slough dike to meet the flood protection standards that are acceptable to the local diking district, Consolidated Diking and Drainage District #22, and consistent with U.S. Army Corps of Engineers guidelines for flood protection systems in the Skagit wildlife area.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
972,000 4,183,000 5,155,000
State Building Construction Account - State 5,155,000

Infrastructure Master Plan for SRKW Recovery

40000085

Funding is provided for a master planning process that will assess existing Department of Fish and Wildlife hatchery infrastructure, determine needs and prioritize projects to support the recovery of the Southern Resident Killer Whales (SRKW). The agency will consider impacts from climate change in the master planning process.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
1,000,000 1,000,000
State Building Construction Account - State 1,000,000