Capital Two-Year Agency Detail - Department of Fish and Wildlife
Soos Creek Hatchery Renovation
30000661
Funding is provided for the last phase of the Soos Creek Hatchery renovation project, including habitat restoration and site work, cultural resources mitigation and installation of a water filtration system.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
2,936,000 | (3,031,000) | (95,000) |
State Building Construction Account - State | (95,000) |
Beaver Creek Hatchery - Renovation
30000680
This project is to predesign the renovation of the Beaver Creek Hatchery to create and maintain recreational fishery opportunities in southwest Washington. Design and permitting activities will occur during the 2021-23 biennium, with construction scheduled for the following biennium.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
150,000 | 11,355,000 | 11,505,000 |
State Building Construction Account - State | 11,505,000 |
Eells Springs Production Shift
30000723
Funding is reappropriated from the 2015-17 biennium to continue the modification and expansion of the Eells Springs hatchery intake and water supply line to maintain lowland trout production in western Washington. This project’s reappropriation was increased to reflect appropriations left unspent in the 2017-19 biennium.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
(146,000) | 146,000 |
State Building Construction Account - State |
Forks Creek Hatchery - Renovate Intake and Diversion
30000827
A missed reappropriation from the 2017-19 biennium for an approved fund transfer is provided. The transfer was from the Hoodsport Hatchery Adult Pond Renovation project (40000026) to the Forks Creek Hatchery - Renovate Intake and Diversion project (30000827).
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
196,000 | 154,000 | 350,000 |
State Building Construction Account - State | 350,000 |
Wiley Slough Dike Raising
40000004
Funds are provided to address the deficiencies of the Wiley Slough dike to meet the flood protection standards that are acceptable to the local diking district, Consolidated Diking and Drainage District #22, and consistent with U.S. Army Corps of Engineers guidelines for flood protection systems in the Skagit wildlife area.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
972,000 | 4,183,000 | 5,155,000 |
State Building Construction Account - State | 5,155,000 |
Infrastructure Master Plan for SRKW Recovery
40000085
Funding is provided for a master planning process that will assess existing Department of Fish and Wildlife hatchery infrastructure, determine needs and prioritize projects to support the recovery of the Southern Resident Killer Whales (SRKW). The agency will consider impacts from climate change in the master planning process.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
1,000,000 | 1,000,000 |
State Building Construction Account - State | 1,000,000 |